Working At Height News Channel

Track Mounted Rail Pit Board

27th July 2017

We were asked to innovate to prevent engineers standing on tip toe to reach the underside of trains, to create a 3.00m long mobile pit board that could easily be moved the length of the pit road, and with a braking system.

Pictured is the delivered and hugely successful result, with the default position being brakes on, the brake handle moved left or right to allow the flanged rail wheels to move freely, with the brake being applied when the handle is released.

Finished with aluminium anti-slip tread plate, and lay flat lifting cleats so the it can be craned into position. 

Click on image to enlarge.


Working at Height

Head Office: 01483 415 410

 

From outside the UK call..

+44 1483 415 410
 

Twitter Instagram Youtube
www.nass.co.uk

Our Supported Charity.

We support the National Ankylosing Spondylitis Society,
dedicated to the needs of those affected in the UK.

Please click their logo to visit their site.

 

News

Bespoke Drawbridge Access Platform for Front of Train

We have designed, manufactured and just this week installed an innovative, one-of-a-kind drawbridge access platform to provide safe and efficient...

Lightweight Rail Depot Pit Boards

Lightweight Pit Boards – Easier Handling Without Compromising on Strength

We have developed a lightweight aluminium pit board designed to make access across...