When the very latest in track laying technology is procured regardless of the millions spent there are often afterthoughts, in this case it was access to the carriage mounted cranes for maintenance and repair shown is the solution at a west London sidings, two spilt level platforms bolted in place, manufactured in aluminium and with GRP grated decking.